Phase I: Place Battery on a 2-Year Replacement Schedule

Phase II: Implement Improvements to Electrical Ground Circuit

Phase III: Implement Improvements to Electrical Charging and Power Distribution Circuit

Phase IV: Install Solid-State Voltage Regulator with Crowbar Overvoltage Protection

Phase V: Install Electrical/Engine Systems Failure Annunciation Panel

Phase VI: Remove Avionics Master Switch

Phase VII: Split Power Distribution Bus Into Main And Essential Circuits

Phase VIII: Replace Factory Split Master Switch with Improved Switch and Remove Key-Operated Magneto Switches

Phase IX: Install Solid-State Panel Lamps Dimmer Switch