Phase I: Place Battery on a 2-Year Replacement Schedule
Phase II: Implement Improvements to Electrical Ground Circuit
Phase III: Implement Improvements to Electrical Charging and Power Distribution Circuit
Phase IV: Install Solid-State Voltage Regulator with Crowbar Overvoltage Protection
Phase V: Install Electrical/Engine Systems Failure Annunciation Panel
Phase VI: Remove Avionics Master Switch
Phase VII: Split Power Distribution Bus Into Main And Essential Circuits
Phase IX:
Install Solid-State Panel Lamps Dimmer Switch
Other future ideas
Please note: the information in these pages is a compilation of learning from Bob Nuckolls and the Aeroelectric Connection. anything that seems clever here was more than likely plagiarized from him.
If you find these concepts intriguing, visit his web site. Even better, buy his book.